The 110kV Substation Project for Weng'an Longma Phosphorus Industry is designed to enable the comprehensive utilization of yellow phosphorus tail gas, providing efficient and sustainable industrial power supply solutions. Developed by HNAC, this project integrates an advanced computer monitoring system, protection, measurement, and control system, ensuring reliable and intelligent substation operation. Ideal for industrial energy optimization, this substation supports stable electricity delivery and enhances energy efficiency in renewable and industrial applications.More
HNAC provides the design supply installation and commissioning of the newly-added interval computer monitoring system and protection measurement and control system on this site The project successfully put into operation and delivery of electricity after three-month renovation and construction