HNAC's 110kV Substation Upgrade and Transformation Project is designed for comprehensive recovery of valuable metals in zinc smelting, offering efficient, reliable, and eco-friendly solutions. Ideal for industrial-scale metal processing and energy infrastructure enhancement, this project integrates advanced primary and secondary system design, protection, measurement, and control. Completed within 3 months, it ensures seamless operation, supports sustainable energy systems, and meets global standards for smart grid applications in the新能源 industry.More
HNAC provides the primary and secondary design, protection, measurement and control of the entire station, system supply and product installation and commissioning, the project was successfully put into operation after completing the transformation and construction of the entire station within 3 months.