Load Shifting
Store electricity during off-peak times and use electricity at peak times. Save money by avoiding electricity peak rate.
Renewables Clipping
With combination of ESS and renewables, balance the flow of renewables to loads by storing and discharging energy.
Emergency Backup Power
In case of a blackout, provide uninterrupted emergency backup power for important loads to reduce economic losses incurred thereby.
2020
The project began in Ontario, Canada in 2020. The first and second batches of 26 MWh have been delivered successfully and the total volume of the project is expected to be 40 MWh.




