Combine fluid and thermal simulation, optimise the design, and recommend the parameters to meet the efficiency of the energy storage system and the national standard temperature rise. Meet the requirements of "five preventions", self-sustain key parts, and optimise costs and delivery.
The dry mass of the core components can be reduced by autonomy and control. It has passed the 4500-metre-high altitude test, and the insulation performance is excellent. IPD process and quality management mode, high one-time qualification rate, MES production management realises process traceability, and products use PLM for full life cycle management.
Regularly inspect and troubleshoot the equipment to ensure the safe and reliable operation of the equipment. Set up service responsibilities according to the province, and set up a full-time team nearby to reserve spare parts and tools. Achieve 1 hours of rapid response and service, and 4 hours to the project site.

